Have been so very busy with tasting room work haven’t posted recently.
Since last post May 19 much has been done.
All the mini-splits have been installed, so we have A/C in the whole building.
All the final painting finished May 31.
All the rain gutters were installed that day.
The last 3 interior doors were installed.
The fire alarm system was tested and approved by the county.
The cable railing system was installed on the deck.
Here are a couple ‘walking tour’ videos taking Friday evening – inside and on the deck.
Remaining to be done include:
the water treatment system (approved by county last week, so now can order and install and get final bacteria tests done).
Handicap parking spot.
A couple items inside – wood trim over i-beams (as seen in video) and door latches in 3 pocket/sliding doors.
Install toilets, sinks, etc. in the bathrooms.
Purchase install 3 bay sink and dishwashers in kitchen.
the water treatment system (approved by county last week, so now can order and install and get final bacteria tests done).
Handicap parking spot.
A couple items inside – wood trim over i-beams (as seen in video) and door latches in 3 pocket/sliding doors.
Install toilets, sinks, etc. in the bathrooms.
Purchase install 3 bay sink and dishwashers in kitchen.
With these done I hope to be able to get a certificate of occupancy from the county in the next 2-3 weeks.
One the wine side, we continue to be open Thurs/Fri/Sat 11-6.
In the last week 4 wines from 2023 harvest were bottled – more ‘bubbly’ Gewurztraminer and Rose, the ‘regular’ Rose, and our first Rkatsiteli. Stop by to check them out! They are now stored in the tasting room ‘wine cellar’!
More will be bottled in the next couple weeks.
In the last week 4 wines from 2023 harvest were bottled – more ‘bubbly’ Gewurztraminer and Rose, the ‘regular’ Rose, and our first Rkatsiteli. Stop by to check them out! They are now stored in the tasting room ‘wine cellar’!
More will be bottled in the next couple weeks.